Elektrine lite

← Feed

@whirly@netzsphaere.xyz

2026-09-25 17:14 UTC

I offered to install signs because the stuff they fill the hole with has to be done between 65-77F and it’s about to dip lower than that. but I need an auger and I don’t wanna buy myself an auger to do a weird work task. I’ve been texting around seeing if anyone has one I can borrow why can’t McDonald’s get their shit together and have the supplies needed to finish task I have 8 boxes of CAT5e cables and a shit ton of security cameras that need to go up too

Replies (0)

No replies.